Project Banner

 

2006 Bridge Replacement Projects, Bexar, Guadalupe, Kendall, Wilson, and Comal Counties, Tx (TxDOT – San  Antonio District)

DSC_0470Poznecki-Camarillo., Inc. was the Prime Consultant for TxDOT in preparing plans, specifications and estimate documents for the widening/replacement of 9 bridges throughout the San Antonio District.  These projects were all on an accelerated schedule and were designed and let for construction in 5 months.  Project included FM 541 at Marcelinas Creek, FM 541 at Draw, US 87 at Cibolo Creek, FM 311 at Miller Creek, IH 10 Frontage Roads at Salatrillo Creek, BS 46C in New Braunfels, BI-35 at Guadalupe River, and FM 78 at Walnut Branch.  The project involved environmental clearance, horizontal and vertical alignment design, traffic control plans, typical section design, signing and striping, culvert layouts, bridge design, complex hydrologic and hydraulic analysis and design, storm water pollution prevention plans, cross sections, and Category 6 funding justification.  These projects were estimated at $6.5 million and are currently under construction.

 

 

foot divider