Labor & Leigh Streets, San Antonio, TX (City of San Antonio Housing Authority)

MVC-015FPoznecki-Camarillo, Inc. was contracted by SAHA as Prime Consultant to provide engineering services for the reconstruction of Labor and Leigh Street in the downtown district of San Antonio.  The roadway consisted of a two-lane section with adjacent parallel parking along the streets. Tasks included roadway design, drainage design, utility coordination, water main and sewer main replacement as per SAWS specifications, storm sewer design, detail design, traffic control plans, and cost estimating.  This project was estimated at $1.5 million and construction was completed December 2007.


 

 

 