I-10 HOV, Managed Lanes (TxDOT)

I-10 HOV, Managed Lanes (TxDOT)

Role: Subconsultant   |   Client: TxDOT, San Antonio District This was a high-profile, added capacity project that included the addition of one general-purpose lane and one HOV lane in each direction on I-10 from FM 3351 (Ralph Fair Road) to La Cantera Parkway. PCI...
San Antonio River – Museum Reach Expansion (SARA)

San Antonio River – Museum Reach Expansion (SARA)

Role: Subconsultant   |   Client: San Antonio River Authority (SARA) In 2009, a new River Walk extension was completed and named as the Museum Reach. This extension included a 1.33-mile stretch that includes the San Antonio Zoo, Japanese Tea Gardens, Brackenridge...